Argos – Delivery Date: 2017/2018
Client: Samsung Heavy Industries
End User: BP
Equipment:
- 12X Linear Chain Jack Assemblies (171mm, 6600 kN Stall Capacity)
- 12X Turndown Sheave Assemblies
- 4X Hydraulic Power Unit Assemblies
- 4X HPU Control Enclosures
- 4X Local Control Enclosures for Chain Jacks
- 1X PLC Enclosure
Water Depth: >1,300m
Service Life: 35 years
Location: Gulf of Mexico
Certifying Authority: American Bureau of Shipping (ABS), USCG, & BSEE (Bureau of Safety and Environmental Enforcement)
Jack-St. Malo – Delivery Date: 2012
Client / End User: Chevron North America Exploration & Production Company
Equipment:
- 16X Linear Chain Jack Assemblies (165mm, 8000 kN Stall Capacity)
- 16X Turndown Sheave Assemblies
- 1X Hydraulic Power Unit Assembly
- 1X HPU Control Enclosure
- 4X Local Control Enclosures for Chain Jacks
- 1X PLC Enclosure
Service Life: 30 years
Location: Gulf of Mexico
Certifying Authority: American Bureau of Shipping (ABS), USCG & Minerals Management Service (MMS)

Kikeh – Delivery Date: 2006
Client: Technip Marine
Equipment:
- 10X Linear Chain Jacks (124mm)
- 10X Turndown Sheaves
- 1X Hydraulic Power Unit
- 4X Local Control Consoles
- 1X PLC Assembly
Water Depth: 1,300m
Service Life: 20 years
Location: Malaysia
Certifying Authority: DNV and ABS

Atlantis – Delivery Date: 2003
Client / End User: BP
Equipment:
- 12X Linear Chain Jacks (171mm)
- 12X Bending Shoes (171mm)
- 1X Hydraulic Power Unit
- 4X Local Control Consoles
- 1X PLC Assembly
Water Depth: >2,000m
Location: Gulf of Mexico
Certifying Authority: ABS
Thunder Horse – Delivery Date: 2002
Client / End User: BP
Equipment:
- 16X Linear Chain Jack Assemblies (150mm)
- 16X Turndown Sheave Assemblies
- 4X Local Control Console Assemblies
- 4X Hydraulic Power Unit Assemblies
- 1X PLC Enclosure Assembly
Water Depth: >1,800m
Location: Gulf of Mexico
Certifying Authority: ABS
Hoover/Diana – Delivery Date: 2002
Client: Aker Rauma Offshore
Equipment: 12X 522Te Linear Chain Jack Assemblies (151mm)
Water Depth: >1,400m
Location: Gulf of Mexico
Genesis – Delivery Date: 1998
Client: Aker Rauma Offshore
End User: Chevron
Drilling, production spar dictates difference in mooring setup | Offshore
Genesis offshore platform still setting the bar — Chevron
Equipment:
- 14X 522Te Linear Chain Jack Assemblies (133mm)
- 14X Turndown Sheave Assemblies
- 2X Hydraulic Power Unit Assemblies
- 4X Local Control Panel Assemblies
- 2X Local PLC Enclosures
Water Depth: >700m
Location: Gulf of Mexico
Oryx Neptune SPAR – Delivery Date: 1996
Client: Rauma Offshore Contracting
Equipment:
- 6X 318Te Linear Chain Jack Assemblies (120mm)
- 1X Hydraulic Power Unit (HPU)
- 1X PLC Assembly
- 3X Local Control Console Assemblies
Water Depth: >500m
Location: Gulf of Mexico